Loveland Ready Mix Concrete, Inc.

Locally owned and operated, family business with a commitment to providing quality concrete, combined with superior service

  • Home
  • About
  • FAQs
  • Employment
  • Color Chart
  • Concrete Blocks
  • Contact
  • Employees
  • Laporte

LOVELAND
DISPATCH
970.667.1108
•
JOHNSTOWN
DISPATCH
970.203.1144
•
BOULDER
DISPATCH
303.444.4992

LOVELAND
DISPATCH
970.667.1108
• JOHNSTOWN
DISPATCH
970.203.1144
• BOULDER
DISPATCH
303.444.4992
  • Facebook

How soon can new concrete be put into use?

January 15, 2016 By

During periods of moderate to warm weather, new concrete could be opened for pedestrian traffic in twelve to twenty-four hours, or when the surface becomes “scuff resistant.”  A general guideline is that new concrete should not be opened for vehicular traffic for a minimum of seven days.  This seven-day period can be significantly reduced by using a faster setting, stronger concrete mix.  Please note that concrete gains strength more slowly in colder weather so more time may be needed before putting your new concrete into use.

Loveland Ready Mix


644 N Namaqua Ave.
Loveland, CO 80539
970.667.1108

Johnstown Ready Mix


25930 County Rd. 13
Johnstown, CO 80534
970.203.1144

Boulder Ready Mix


3180 61st St.
Boulder, CO 80301
303.444.4992

Copyright © 2021 Loveland Ready Mix Concrete, Inc. | Privacy Policy